Signed online. Verified.
Building owners sign the WWZ fibre contract online and confirm it with a code by e-mail or phone. The signed PDF is stored with the contract.
WWZ supplies energy, water and telecommunications and builds fibre to the home. Every building needs a signed contract before the fibre can come in.
From the first letter to the last fibre
Lots and cells of the rollout.
Every object with its address.
Apartments with their OTO IDs.
Owners sign the house connection.
The survey of the building.
Shafts, cable pulls, openings.
Installation and completion.
From contract to signed PDF
Built from the data of the building and the owners.
Confirmed by e-mail or by phone.
The signed contract is stored with the building.
Partially signed until every owner has signed.
Every building. Every flat.
Each building carries its flats, and each flat its OTO ID from the pool. Nothing gets connected twice, nothing gets forgotten.
Where the street meets the house
Every shaft of the network.
From the street to the building.
Planned and recorded.
Where the fibres meet.
The work inside the building.
Checked and closed.
The customer owns the process. Zappter runs the solution.
- The network and the owners
- The contracts and the process
- The data
- The fibre rollout solution
- Online signatures
- Hosting and changes
WWZ owns the network, the owners and the process. Zappter built the solution on the Zappter Engine and runs it.
More customer solutions
Your own solution.
Built on Zappter Engine, under your own address and login, changed in weeks.